保温材料施工时应注意的问题
来源: 日期:2018-09-11 发布人:admin

说到保温材料,大家会不会想到有关热量传递的知识呢?生活中处处存在热传导、热对流,它们无时无刻不在发生着,这些热量传递的途径其实就是在散热,如果冬天来临的话,大家肯定都想着保温而不是想着散热了。那建筑工地施工的时候应当恰当的使用一些保温材料,争取让大家的居住环境可以冬暖夏凉。接下来我们就给大家讲一讲该类保温材料在施工时应该注意的问题。

When it comes to insulation materials, do you think about the knowledge of heat transfer? There is heat conduction and convection everywhere in life, they happen all the time. These ways of heat transfer are actually heat dissipation. If winter comes, people must think about heat preservation instead of heat dissipation. The construction site should be properly used when some insulation materials, so that everyone's living environment can be warm in winter and cool in summer. Next, we will talk about the problems that should be noticed in the construction of this kind of insulation materials.

积极改善济南保温材料厂家的施工质量、控制好该部分的质量是确保保温工程质量的重要环节。

Actively improving the construction quality of Jinan thermal insulation material factory and controlling the quality of this part are important links to ensure the quality of thermal insulation project.

工具/原料

Tools / raw materials

材料准备:DY无机活性墙体保温材料由厂家提供配制好的干拌料现场搅拌,应按需要运送现场,并要有防雨防潮措施。材料进场后应组织有关人员按规定进行报验,其他辅助材料现场准备以30天为准。

A级防火保温材料

Material preparation: DY inorganic active wall insulation materials prepared by the manufacturer to provide dry mixing materials on-site mixing, should be transported on-site as required, and there are waterproof and moisture-proof measures. After entering the venue, the relevant personnel shall be organized to report for inspection according to the regulations, and the site preparation of other auxiliary materials shall be based on 30 days.

施工机具准备:搅拌机、灰斗,垂直运输机具,水平运输手推车等。常用抹灰工具及抹灰检测工具,放线工具、水桶、扫帚、钢尺等。

Preparation of construction machinery: mixer, ash hopper, vertical transport equipment, horizontal transport trolley, etc. Commonly used plastering tools and plastering detection tools, laying tools, bucket, broom, steel ruler and so on.

施工条件

Construction conditions

1.保温材料应在基层墙体工程质量验收合格后进行。

1. insulation materials should be carried out after acceptance of the quality of the wall works.

2.清除基层墙面灰尘、油污,对疏松、开裂处进行修补。

2. remove dirt and grease from the base wall, and repair the loose and cracked parts.

3.门窗框安装完毕,处墙的落水管、各种进户管线、预埋件已安装到位。

3. the installation of doors and windows frame, the wall of the downpipe, all kinds of household pipelines, embedded parts have been installed in place.

工艺流程

Technological process

清理基层—套方、吊垂直、弹控制线、冲筋、做口、复检—抹DY无机保温隔热材料—弹分格线、开分格槽、嵌贴滴水槽、保温层验收—外墙涂料

Clean up the base course - set square, vertical lifting, bullet control line, impact bar, mouth, re-inspection - plaster DY inorganic thermal insulation material - Bullet grid, split slot, insert drip tank, insulation layer acceptance - exterior wall coating

施工方法

Construction method

1.清理基层墙面:基层墙体必须清理干净,要求墙面无油渍、灰尘、污垢、脱膜剂、风化物、泥土等污物,基层墙体的表面平整度、立面垂直度不得超过5mm。基层墙面若太干燥,吸水性能太强时,应先洒水喷淋湿润。现浇砼墙面应事先拉毛,并进行喷浆。

1. Clean up the base wall: The base wall must be cleaned up. It requires no oil stains, dust, dirt, film remover, weathering, soil and other dirt. The surface flatness and vertical degree of the base wall should not exceed 5mm. If the base wall is too dry and the water absorption is too strong, sprinkle and moisten it first. Cast in place concrete walls should be pre coated and shotcreting.

2.套方、吊垂直、弹控制线、冲筋、做口、复检:

2. sets of square, hanging vertical, projectile control lines, rebar, mouth and re inspection:

弹控制线:根据建筑立面设计和外墙外保温技术要求,在墙面弹出处门窗水平、垂直控制线及伸缩缝线、装饰缝线等。

Elastic control line: According to the design of building facade and the technical requirements of external wall insulation, horizontal and vertical control line of doors and windows, expansion line, decorative line and so on at the wall pop-up.

挂基准线:在建筑外墙大角(阴阳角)及其他必要处挂垂直基准钢线,每个楼层适当位置挂水平线,用以控制保温层的垂直度和平整度。

Hanging datum line: Hanging vertical datum steel wire at large angle of building exterior wall (Yin-Yang angle) and other necessary places, and hanging horizontal line at appropriate position of each floor to control the verticality and flatness of insulation layer.

根据设计图纸的要求,弹厚度控制线。按厚度控制线要求在墙上作出标准灰饼,用保温材料作灰饼。

According to the requirements of the design drawings, bomb thickness control line. According to the thickness control line, the standard gray cake is made on the wall, and the thermal insulation material is used as the cake.

我们在工具、材料、施工条件、工艺流程、施工方法等方面为大家说明了施工人员使用保温材料的时候应该注意的问题,施工人员应该提前查好相关的问题,更好的为大家服务。如果您对我们公司的产品感兴趣,不妨打电话交流一下,说不定大家都有新的收获哦!

We in the tools, materials, construction conditions, technological processes, construction methods and other aspects of the use of thermal insulation materials for the construction personnel should pay attention to the problems, construction personnel should check the relevant problems in advance, better service for everyone. If you are interested in our company's products, you might as well call and exchange, maybe everyone has a new harvest Oh!


上一篇:符合时代发展的保温隔热材料-STP保温板
下一篇:聚氨酯原料特点和使用注意事项

 
在线咨询
全国咨询热线
18769786220
友情链接:M5彩票网  GT彩票网  天天彩票网  W彩票官网  W彩票平台  皇冠彩票  W彩票官网  

免责声明: 本站资料及图片来源互联网文章,本网不承担任何由内容信息所引起的争议和法律责任。所有作品版权归原创作者所有,与本站立场无关,如用户分享不慎侵犯了您的权益,请联系我们告知,我们将做删除处理!